Annual Maintenance Estimates – Venkatachalam Pushkara & Tadipudi Lift Irrigation Scheme


The Engineer-in-Chief (Irrigation), Hyderabad stated in his letter that the Engineer-in-chief (ISPP), Dowlaiswram has submitted the Annual Maintenance estimates of (1) Thota Venkatachalam Pushkara Lift Irrigation Scheme and (2) Tadipudi Lift Irrigation Scheme. As per the instructions issued by the Technical Committee on the preparation of annual maintenance estimates of Lift Irrigation Schemes taken up under Jalayagnam, the O&M estimates of (1) Thota Venkatachalam Pushkara Lift Irrigation Scheme for 2012-13 and (2) Tadipudi Lift Irrigation Scheme for 2012-13, have been scrutinized.   The extra amount required for the above 2 schemes shall be met from the savings in the other heads of the respective schemes by re-appropriation of funds.

In view of the circumstances stated by the Engineer-in-Chief (Irrigation), Hyderabad, Government after careful examination hereby accord administrative approval for Annual Maintenance Estimate for O&M of (1) Thota Venkatachalam Pushkara Lift Irrigation Scheme for Rs.2.8424 crores (Rupees two crores eighty four  lakhs  and  twenty  four  thousands  only)  and  (2)  Tadipudi  Lift  Irrigation Scheme for Rs.26.7722 crores (Rupees twenty six crores seventy seven lakhs and twenty two thousands only) (Rs.24.2313 crores towards electricity charges and Rs.2.5409 crores for Maintenance charges) for the year 2012-13 (i.e., from 1-10-2012 to 31-5-2013).

The expenditure sanctioned at para (2) above shall be debited to the following head of Accounts:

Sl.

No.

Name of the Scheme Head of Account
1. Tadipudi Lift

Irrigation Scheme

DA-4700-Major Irrigation, 01 – MH-158- Tadipudi Lift Irrigation Scheme – GH-11 – Normal State Plan, SH-26 – D&A – 270 – Minor works – 274 HTCC Charges

————————————————————-

530 – Major works – 531 – Other Expenditure.

2. Thota

Venkatachalam Pushkara Lift Irrigation Scheme

DA-4700-Major  Irrigation,  01  –  MH-157  –

Polavaram  Lift  Irrigation  Scheme  (Pushkara Lift  Irrigation  Scheme)  –  GH-11  –  Normal State  Plan,  SH-26 – Dam  and  Appurtenant works – 530 – Major works – 531- Other Expenditure –

————————————————————- SH(27) Canals & Distributaries -530 – Major works – 531 – Other Expenditure.

The Engineer-in-Chief (Irrigation), Hyderabad / ENC, Indira Sagar Polavaram Project, Dowlaiswaram shall take further action accordingly.

This order issued with the concurrence of Finance (W&P) Department, vide their U.O.No.233/F7(A1)/2013, dated.29-1-2013.

G.O.Rt.No. 102  Dated.16.02.2013. Read the following:-

1. From the ENC(I), Hyderabad, Lr.No.ENC(I)/DCE(GDS)/Dy.EE.2/AEE.1/ Lift Irrigation, Dt.15-10-2012 and other letter dt.2-12-2012.

2. From the ENC,ISPP, Dowlaiswaram, Lr.No.ENC/ISPP/DCE2/OT2/AE2, Dt.11-1-2013. spacing:-.1pt’>A1)/2013, dated.29-1-2013.

Leave a comment

Your email address will not be published. Required fields are marked *