Junction Improvements to Kodangal & Kosgi Towns


The Chief Engineer (R&B) CRN & MD, APRDC, Hyd., has stated that Kodangal village is located at the intersection of Hyderabad – Bijapur State Highway at Km 109/4-6 and Mahabubnagar – Chincholi State Highway at Km 59/2-4. Kosgi town is located on Mahabubnagar – Chincholi State Highway at Km 42/0-2, wherein in the junctions Tunkimetla – Narayampet and Kosgi – Doulathabad MDRs are existing. The junction improvements to Kodangal and Kosgi town limits are provided in the OPRC Package – 25. But, as per the site conditions and topographical necessity of the villages an additional length of junction improvement is required. The Hon’ble MLA., Kodangal Constituency has requested for Butterfly lighting arrangement and chequered tiles in the Central median of Kodangal & Kosgi town limits. Widening  of CD works along with the ducts to avoid future road cuttings. Further a resolution was passed by the Gram Panchayats of Kodangal and Kosgi to maintain the electrical lighting system after handing over the same. The CE has also reported that the front side compound wall of Kodangal (R&B) Inspection Bungalow is falling in the limits of road boundary, hence to be reconstructed, after widening the road is completed.

The Chief Engineer (R&B) CRN & MD, APRDC, Hyd., has requested the Government  to accord administrative sanction for the work of ‘Junction Improvements to Kodangal & Kosgi Towns including providing central divider and road side drains on Hyderabad – Bijapur road from Km 108/9 to 110/3 (Kodangal town), on Mahabubnagar-Chincholi road in Km 57/8 to 59/6 (Kodangal town) & in Km 41/3 to 42/8 (Kosgi town) in Mahabubnagar District,  for an amount of Rs.1000.00 Lakhs,  under Corenet Plan Scheme.

After examination of the matter, Government hereby accord administrative sanction for the work of ‘Junction Improvements to Kodangal & Kosgi Towns including providing central divider and road side drains on Hyderabad – Bijapur road from Km 108/9 to 110/3 (Kodangal town), on Mahabubnagar-Chincholi road in Km 57/8 to 59/6 (Kodangal town) & in Km 41/3 to 42/8 (Kosgi town) in Mahabubnagar District,  for an amount of Rs.1000.00 Lakhs (Rupees ten Crores only), under Core Net Plan scheme, for the year 2013-14.

The amount sanctioned in Para (3) above, shall be met from the  Head of account -5054–Capital outlay on Roads and Bridges-04 -District and other Roads-MH800- Other Expenditure-GH 11-Normal State Plan- SH(33)–Core net Works Roads (works)-530–Major works-531–Other Expenditure.

The Chief Engineer (R&B) CRN & MD, APRDC, Hyd., shall take further action in the matter accordingly.

These orders issues with the concurrence of Finance (Expr.PW) Department vide their U.O.No.15715/570/Expr.PW.II/2013, dt:17.06.2013 .

G.O.Rt.No. 1181 Dated: 21-11-2013
From Chief Engineer (R&B) CRN & MD, APRDC, Hyd., Lr.No.21313/APRDC/GM(RDC)/DCEII/DEE-8/AEE21/2012-13, Dt:25.03.2013&30-05-2013