Consumer Category

Energy

Unit

 

Fixed Charge

Energy

Charge

(`/Month) (`/Unit)
LT-I:DOMESTIC (Telescopic)      
LT I(A):Upto 50 Units/Month kWh  

1.45

LT I(B):Above 50 Units/Month    

0.00

First 50 kWh  

2.60

51-100 kWh  

3.25

101-150 kWh  

4.88

151-200 kWh  

5.63

201-250 kWh  

6.38

251-300 kWh  

6.88

301-400 kWh  

7.38

401-500 kWh  

7.88

Above 500 kWh  

8.38

LT-II:NON DOMESTIC/COMMERCIAL    

0.00

LT II(A):Upto 50 Units/Month kWh/kVAh 50/kW

5.40

LT II(B):Above 50 Units/Month    

0.00

First 50 kWh/kVAh 50/kW

6.63

51-100 kWh/kVAh 50/kW

7.38

101-300 kWh/kVAh 50/kW

8.13

301-500 kWh/kVAh 50/kW

8.63

Above 500 kWh/kVAh 50/kW

9.13

LT II(C):ADVERTISEMENT  HOARDINGS kWh/kVAh 50/kW 11.03
LT-III:INDUSTRY    

0.00

Industries kWh/kVAh 50/kW

6.08

Seasonal Industries (off season) kWh/kVAh 50/kW

6.75

Pisciculture/Prawn culture kWh/kVAh 20/kW

4.63

Sugarcane crushing kWh 20/kW

4.63

Poultry farms kWh/kVAh 50/kW

5.63

Mushroom & Rabbit Farms kWh/kVAh 50/kW

5.63

Floriculture in Green House kWh/kVAh 50/kW

5.63

LT-IV:COTTAGE INDUSTRIES    

0.00

Cottage Industries upto 10 HP kWh 20/kW

3.75

Agro Based Activity upto 10 HP kWh 20/kW

3.75

LT-V:AGRICULTURE    

0.00

LT-V(A):AGRICULTURE  WITH DSM MEASURES    

0.00

Corporate Farmers & IT Assesses kWh  

2.50

Wet Land Farmers (Holdings >2.5 acre) kWh 525/HP *

0.50

Dry Land Farmers (Connections > 3 nos.) kWh 525/HP *

0.50

Wet Land Farmers (Holdings <= 2.5 acre) kWh  

0.00

Dry Land Farmers (Connections <= 3 nos.) kWh  

0.00

 

 

Consumer Category

Energy

Unit

 

Fixed Charge

Energy

Charge

(`/Month) (`/Unit)
LT-V(B):AGRICULTURE  WITHOUT DSM MEASURES    

0.00

Corporate Farmers & IT Assesses kWh  

3.50

Wet Land Farmers (Holdings >2.5 acre) kWh 1050/HP *

1.00

Dry Land Farmers (Connections > 3 nos.) kWh 1050/HP *

1.00

Wet Land Farmers (Holdings <= 2.5 acre) kWh 525/HP *

0.50

Dry Land Farmers (Connections <= 3 nos.) kWh 525/HP *

0.50

LT-V(C):OTHERS    

0.00

Salt farming units upto 15HP kWh 20/HP

3.70

Rural Horticulture Nurseries  upto 15HP kWh 20/HP

3.70

LT-VI:STREET LIGHTING AND PWS      
LT-VI(A):STREET LIGHTING      
Panchayats kWh 30/kW

5.37

Municipalities kWh 30/kW

5.87

Municipal Corporations kWh 30/kW

6.37

LT-VI(B):PWS SCHEMES      
Panchayats kWh/kVAh 30/HP

4.37

Municipalities kWh/kVAh 30/HP

5.37

Municipal Corporations kWh/kVAh 30/HP

5.87

LT-VII:GENERAL    

0.00

LT-VII(A):GENERAL PURPOSE kWh/kVAh 20/kW

6.53

LT-VII(B):RELIGIOUS PLACES kWh 20/kW

4.70

LT-VIII: TEMPORARY SUPPLY kWh/kVAh 20/kW

9.43

HT-I:INDUSTRY    

0.00

HT-I(A):GENERAL    

0.00

11 kV kVAh 350/kVA

5.73

33 kV kVAh 350/kVA

5.30

132 kV & Above kVAh 350/kVA

4.90

LIGHTS AND FANS      
11 kV kVAh  

5.73

33 kV kVAh  

5.30

132 kV & Above kVAh  

4.90

INDUSTRIAL COLONIES      
11 kV kVAh  

5.68

33 kV kVAh  

5.68

132 kV & Above kVAh  

5.68

SEASONAL INDUSTRIES      
11 kV kVAh 350/kVA

6.90

33 kV kVAh 350/kVA

6.28

132 kV & Above kVAh 350/kVA

6.03

TIME OF DAY TARIFFS(6 PM to 10 PM)      
11 kV kVAh  

6.73

33 kV kVAh  

6.30

132 kV & Above kVAh  

5.90

 

 

Consumer Category

Energy

Unit

 

Fixed Charge

Energy

Charge

(`/Month) (`/Unit)
HT-I(B):FERRO ALLOY UNITS      
11 kV kVAh  

5.41

33 kV kVAh  

4.98

132 kV & Above kVAh  

4.58

HT-II:OTHERS      
11 kV kVAh 350/kVA

6.90

33 kV kVAh 350/kVA

6.28

132 kV & Above kVAh 350/kVA

6.03

TIME OF DAY TARIFFS(6 PM to 10 PM)      
11 kV kVAh  

7.90

33 kV kVAh  

7.28

132 kV & Above kVAh  

7.03

HT-III:AIRPORTS,BUS STATIONS AND RAILWAY

STATIONS

     
11 kV kVAh 350/kVA

6.58

33 kV kVAh 350/kVA

6.01

132 kV & Above kVAh 350/kVA

5.72

TIME OF DAY TARIFFS(6 PM to 10 PM)      
11 kV kVAh  

7.58

33 kV kVAh  

7.01

132 kV & Above kVAh  

6.72

HT-IV:IRRIGATION, AGRICULTURE AND CPWS      
Irrigation & Agriculture kVAh  

5.37

CPWS kVAh  

4.39

HT-V:RAILWAY TRACTION kVAh  

6.36

HT-VI:TOWNSHIPS AND RESIDENTIAL COLONIES kVAh 50/kVA

5.68

HT-VII:GREEN POWER kVAh   10.78
 

 

HT-VIII:TEMPORARY

kVAh

1.5 times of corresponding HT

category

       
RURAL ELECTRIC CO-OPERATIVES      
Anakapally kWh  

1.32

Chipurupally kWh  

0.55

Sircilla kWh  

0.86

Kuppam kWh  

0.34

* Equivalent flat rate tariff per Year  

TERMS AND CONDITIONS

 ?    FSA will be extra as applicable as notified by the Commission from time to time. The Tariffs are exclusive of Electricity duty payable as per the provisions of AP Electricity Duty Act.

a) Voltage Surcharge

H.T. consumers who are now getting supply at voltage different from  the declared   voltages   and   who   want   to   continue   taking supply   at   the same  voltage  will  be  charged  as  per  the  rates indicated below:

S.No

Contracted

Demand with Licensee and other sources (in kVA)

Voltage at

which Supply should be availed

(in kV)

Voltage at

which consumer is availing supply (in kV)

Rates  % extra over the

normal rates

Demand Energy
Charges Charges
(A) For HT Consumers availing supply through common feeders

1

1501 to 5000

33

11

12%

10%

2

Above 5000 132 or 220 66 or Below 12%

10%

(B) For HT Consumers availing supply through independent feeders

1

2501 to10000

33

11

12%

10%

2

Above 10000 132 or 220 66 or Below 12%

10%

Note:

In case of consumers who are having supply arrangements from more than one source, the RMD or CMD only with the Licensee, whichever    is higher shall  be  the  basis  for  levying   voltage surcharge.

b) Additional charges for exceeding Contracted Demand

If in  any  month  the  Recorded  Maximum  Demand  (RMD)  of the consumer exceeds  his  Contracted   Demand  with  Licensee,  the consumer will pay the following charges on excess demand and energy.

RMD over CMD

Demand Charges on

Excess Demand

Energy Charges on

full Energy

100 to 120 % 2 times of normal charge

Normal

Above 120 % and

up to 200 %

2 times of normal charge 1.15 times of normal charge
More than 200% 2 times of normal charge 1.20 times of normal charge
In case of Category-HT-V  (Railway  Traction),the  energy  charges  shall   be

computed at 1.05 times of normal charges on the entire consumption, if RMD

exceeds 120% of  Contracted Demand

c) Minimum E n e r g y Charges

 

Category Rates for the year 2013-14
LT Categories
 

 

I

 

 

Domestic

Contracted load of 500 watts and below
Single Phase ` 25/Month
contracted load of  above 500 watts
Single Phase ` 50/Month
Three Phase ` 150/Month
 

II (A) & (B)

 

Non- Domestic/ Commercial

Single Phase ` 65/Month
Three Phase ` 200/Month
 

II (C)

Advertisement

Hoardings

 

` 300/Month

 

VI (A)

 

Street

Lighting

Panchayats ` 2/Point/Month
Municipalities

and Corpns.

 

` 6/Point/Month

 

 

VII (A)

General

Purpose

Single Phase ` 50/Month
Three Phase ` 150/Month
 

 

VIII

 

Temporary

Supply

  ` 125/kW   or  part  thereof  of contracted load for first 30 days or part thereof  and ` 75 per kW or part thereof of contracted load for every subsequent period of 15 days or part thereof
HT Categories
Billing demand  

Billing demand shall be maximum  demand recorded during the month or 80% of contracted demand   whichever is higher except HT-VI (i.e. Township and Residential Colonies, for this category the billing demand is Actual Demand Recorded)

Minimum Energy Charges
 

I(A)

 

Industry – General

50 kVAh/kVA of  billing demand per month
 

 

I(B)

 

 

Ferro Alloy Units

Maximum Demand or Average Actual Demand whichever is higher. The energy falling short of   6701  kVAh  per kVA   per annum will be billed as deemed consumption

II

Others

25 kVAh/kVA  of billing demand per month
 

III

Airports,Bus Stations &  

50 kVAh/kVA of  billing demand per month

 

V

 

Railway Traction

32 kVAh /kVA of Contracted demand/ month
 

VI

 

Townships/Colonies

Billing  demand  shall  be  Actual Recorded demand. 25 Units/kVA of contracted demand/ month

 

Customer Charges

Consumer Category ` /month
LT-I(A) & I(B)  Domestic
0 – 50

25

51 – 100

30

101 – 200

35

201 – 300

40

>300

45

LT-II(A) & II(B) Non-Domestic/Commercial
0-50

30

51-100

35

>100

40

LT-II(C)  Advertisement Hoardings

45

LT-III Industry upto 20 HP

50

LT-III Industry 21 – 50  HP

200

LT-III Industry 51 – 100  HP

750

LT-VII   General Purpose

40

LT-VIII  Temporary Supply

40

All other LT categories

30

HT consumer categories upto 33 kV

1125

HT consumer categories above 33 kV

2250

e) Delayed Payment Surcharge (DPS) LT Category :

a.  In case of LT- I(A), LT-I(B), LT-II(A) and LT-IV, if payment is made after due date, the consumers are liable to pay, Delayed Payment Surcharge (DPS) per month on the bill amount at the rates given in table below.

LT – I(A) ` 10/month
LT-I(B), LT II (A) with Contracted

Load upto 1 kW, LT-IV

` 25/month

 

b.  In case of  LT – II(A) (having contracted load more than 1 kW), LT- II(B), LT- II( C),  LT – III, LT- VI and LT-VII, the Licensee shall levy Delayed Payment Surcharge (DPS) on the bill amount at the rate of 5 paise/`  100/day calculated from the due date mentioned on the bill, up to the date of payment or ` 150 whichever is higher. In case of grant of instalments, the Licensees shall levy interest at the   rate   of   18%   per   annum   on   the   outstanding   amounts compounded annually and the two (DPS and Interest) shall not be levied at the same time.

HT Category :

c.  The Licensees shall charge the Delayed Payment Surcharge (DPS)

per month on the bill amount at the rate of 5 paise/`  100/day or

550 whichever  is higher. In case of grant of instalments,  the

Licensee shall levy interest at the rate of 18% per annum on the outstanding amounts, compounded annually and the two shall not be levied at the same time.

f)  Reconnection Charges

i) Low Tension Services.
LT – I(A) ` 25
For all other LT services  
Overhead Services ` 75
U.G. Services ` 200
ii) High Tension Services
11 kV ` 1000
33 kV ` 2000
132 kV & Above ` 3000

g)  Testing Charges

i) Installations LT HT
The  first  test  and  inspection  of a new installation   or  of  an  extension to  an existing installation  

 

Nil

 

 

Nil

Charges   payable   by  the  consumer in advance for each subsequent test and/or inspection  if  found  necessary owing  to any fault in the installation or to non- compliance of the conditions of supply  

 

 

 

` 20

 

 

 

 

` 200

ii) Meters LT HT
A.C. Single Phase Energy meter ` 100  
A.C. Three Phase Energy  meter ` 300  
LT Tri Vector meter ` 2000  
11 kV   ` 3000
33 kV   ` 3000
132 kV   ` 3000
220 kV & Above   ` 3000
iii) Transformer Oils
First sample of oil ` 150/-per sample
Additional   sample  of  oil  of  the same equipment received at the same time ` 100/-per sample

h) Supervision/Inspection  & checking charges

 

For LT I(A) Domestic

` 100

For LT I(B) Domestic

` 100

LT Agricultural

` 100

For all other LT Categories

` 100

For all HT Categories

` 600

 

i)  Low Power Factor Charges

For all consumer categories where kVAh billing is done, no Low

Power Factor Surcharge shall be levied.

j)  Capacitor Surcharge

LT consumers with kWh based billing (except LT Domestic ,  LT – IV , LT VI (A) , LT – VII (B)) having connected loads mentioned in table below shall pay capacitor surcharge (as per rules in vogue) at the rate of 25% of the billed amount, if  capacitors are found defunct .

Category Contracted

Load

LT II & LT VII (A) <10 kW
LT III & LT VI (B) <20 HP

k)  Fixed Charges  – Seasonal Industry

LT III      : ` 50/kW/Month on 30% of contracted load.

 

HT         :Demand  Charges  –  30%  of  CMD    or  recorded  demand whichever is higher.