1862 Crores for Jawahar Nettempadu Lift Irrigation Scheme


Chief Engineer(P), MBNR has requested for according approval to the Annual Maintenance Estimates for payment of CC charges of Stage I Gudemdoddi & Stage II Relampadu pumping stations for the year 2013-14 ie., from 04/2013 to 3/2014 for an amount of Rs 204.13 Crores. G.O.Ms.No.94 Dated: 21-10-2013

Government after consideration hereby accord administrative approval to the following Annual Maintenance Estimates for payment of CC charges of Stage I Gudemdoddi & Stage II Relampadu pumping stations for the year 2013-14 i.e., from 04/2013 to 03/2014 for an amount of Rs 204.13 Crores (Rupees Two hundred four Crores and thirteen lakhs only) as stated below.

Sl. No.
Name of the work Estimate amount Rs. In Crores
1. Stage-I, Gudemdoddi Pumping station 113.22
2. Stage-II Relampadu pumping station 90.91
Total 204.13

3. The expenditure shall be debited to the Head of Account “MH – 4700 Capital Outlay on Major Irrigation 01 – Major Irrigation (Commercial) MH – 144 – Nettempadu Lift Irrigation Scheme (Jawahar Lift Irrigation Scheme) GH-11 – Normal State Plan SH – 26 – Dam & Appurtenant works 270 – Minor Works 274 – HTCC charges.

4. The Chief Engineer(P), Mahabubnagar shall take necessary action accordingly.

5. This order issues with the concurrence of Finance (W&P) Department vide their U.O. No. 2774/F2(A2)/2013-1, dated 24-08-2013.

Administrative approval has been accorded for Jawahar  Nettempadu  Lift  Irrigation  Scheme  for  Rs.  Rs.1428.00  Crores  to  create irrigation facilities to 2.00 lakh acres in the drought prone upland area of Gadwal and Alampur constituencies covering about 148 Nos of villages besides providing drinking water facilities in Mahabubnagar District.

The Chief Engineer(P), Mahabubnagar has furnished the revised estimate for Jawahar Nettempadu Lift Irrigation Scheme, and, therefore, requested to accord revised administrative approval to Jawahar Nettempadu Lift Irrigation Scheme for an amount of Rs 1862.73 Crores as the works are under brisk progress and some of the works are nearing completion.

Government after consideration hereby accord Revised Administrative Approval for an amount of Rs 1862.73 Crores (Rupees One thousand eight hundred sixty  two  Crores  and  seventy  three  lakhs)  for  Jawahar  Nettempadu  Lift  Irrigation Scheme as per the details annexed to this order.

Jawahar  Nettempadu  Lift  Irrigation  Scheme

The expenditure shall be debited to the Head of Account “MH 4700- Capital

Outlay on Major Irrigation-01- Major irrigation- MH 144 Nettempadu Lift Irrigation- GH 11  Normal  State  Plan-  SH  26-  Dam  and  Appurtenant  Works  SH  27  Canals  and distributaries-SH 49- Rehabilitation and Resettlement”.

The Chief Engineer (P), Mahabubnagar shall take necessary action accordingly.

This order issues with the concurrence of Finance (W&P) Department vide their U.O.No.2504/F2(A2)/2013-1, dated. 08-08-2013.

G.O.Ms.No. 88 Dated: 02-09-2013

ANNEXURE TO G.O.MS. NO. 88 , I&CAD (M&MI-T.1) DEPARTMENT, DATED. 02.09.2013

(Rupees in Lakhs)

Sl.No. Sub- Head Description of Item

As per Administrative sanction

As per

Revised estimate

1

A

Preliminaries 501.72 501.72

II

B

Land 8965.64 31236.00

III

D

Regulators (Head regulators ) 2826.33 2826.33

IV

F

Cross Drainage works. 1475.33 1475.33

V

G

Cross masonry work 597.00 597.00

VI

L

Earth work 13149.59 13149.59

VII

M

Plantation 375.93 370.07
VIII

N

Tanks and Reservoirs

0.00

i)Reservoirs 32470.33 29679.68
ii) Surplus Weir 574.88 520.38

IX

U

Distributary net work for 200000 acres 13000.00 13000.00

X

LIFTING ARRANGEMENTS

0.00

i)

E & M Equipments 32778.00 32778.00

ii)

KV Lines and Sub-Station 2047.60 2047.60

iii)

Taxes & Duties @ 16.28% + 4% C.St. 8483.52 8483.52

iv)

Civil 19086.00 19086.00

XI

P

O & M Charges @ 1.0% per annum 3410.24 3410.24
XII

O

Miscellanious
i) Preparation of Tender Documents 50.50 50.50
ii)Shifting of Electrial Lines 76.44 76.44
iii)Turfing

6.85

6.85

iv)Technical Agent 35.28 35.28
v)Insurance 1807.26 1807.26
vi) Hire charges for inspection vehicles 30.56 30.56
contigency 190.82 386.77
Diversion for Dharur- Ghat road 207.60 1942.00
XIII

Q

Special T & P 50.50 50.50
XIV Labour cess @ 1% on total cost of project work

0.00

135.00
XV Escalation due to price variation

0.00

0.00

i)

Escalation due to price variation onCement, steel and fuel

0.00

3682.00

ii

Escalation due to price variation onE & M components

0.00

6643.00
XVI

K

Buildings 390.62 1934.60
XVII

R

Communication 38.31 38.31
XVIII Additional works

i)

Increase length of 220 KV line in stage-Iand Stage-II

0.00

432.84

iii)

Construction of additional structures

0.00

1186.57

iv)

Submergence Roads

0.00

2171.00

v)

Links and feeders to the Reservoirs

0.00

2261.50

vi)

Rehabilitation and Resettlement

0.00

5500.00
XIX

I

Railway Crossing works 173.15 6370.00
XX

O

Miscellaneous

a

Deposits to APCPDCL towards initial consumption deposits.

0.00

1562.50

b

Amount paid A.P.TRANSCO towards development charges and Supervision Charges

0.00

3084.00

c

Amount paid to AP GENCO towards consultation / wetting charges

0.00

467.68
TOTAL 142800.00 199016.62
Deduct tender premiums of packages(Savings)

0

12743.00
TOTAL PROJECT REVISEDESTIMATE 186273.62
OR SAY Rs.1862.73 Crores.

1.  G.O.Ms.No.108, I & CAD (Maj.Irr.IV) Department dated. 22.06.2005.
2. From the Chief Engineer (Projects), Mahabubnagar, Lr. No.CE(P)/MBNR/JNLIS/ RE/1998, dated.15.12.2012, 28-03-2013 and 09-07-2013.

Leave a comment

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.