Major & Medium Irrigation – Handing over of Peddagedda Project


the Engineer-in-Chief (AW), I&CAD Department, Hyderabad and the Chief Engineer, North Coast,
Visakhapatnam have requested for handing over of Peddagedda Project by the Executive Engineer, Peddagedda Project Division, Salur presently under the control of TTPR Circle, Vizianagaram to the Executive Engineer, Irrigation Division, Parvathipuram of Irrigation Circle, Bobbili for further maintenance and attaching the staff of Peddagedda Project Division, Salur along with two sub divisions to the Office of the Chief Engineer, North Coast, Visakhapatnam The lien and Seniority of the Circle scale establishment of Peddagedda Project
Division is under the control of Irrigation Circle, Visakhapatnam under the terms and conditions laid down.

2. Government after careful examination of the proposal hereby accord permission for handing over Peddagedda Project by the Executive Engineer, Peddagedda Project Division, Salur presently under the control of TTPR Circle, Vizianagaram to the Executive Engineer, Irrigation Division, Parvathipuram of Irrigation Circle, Bobbili for further maintenance and attaching the staff of

Peddagedda Project Division, Salur along with two sub divisions to the Office of the Chief Engineer, North Coast, Visakhapatnam duly suppressing 13 non-technical vacant posts of Peddagedda Project Division, subject to a final decision is taken on these Posts by the next implementation Committee. The Lien and Seniority of the Circle scale establishment of Peddagedda Project Division is under the control of Irrigation Circle, Visakhapatnam on the following the terms and conditions laid down:

(1) To hand over the Peddagedda Project by the Executive Engineer, Peddagedda Project Division, Salur to the Executive Engineer, Irrigation Division, Parvathipuram of Irrigation Circle, Bobbili for further maintenance.

(2) To attach the posts of P.P Division office, sub division Nos 1&3 vide details at annexure-1 to the Office of the Chief Engineer, North Coast, Visakhapatnam to work as supporting staff by re- designating the Executive Engineer post as Deputy Chief Engineer and Deputy Executive Engineers as OTs and AEs/AEEs will look after design and daily routine work in C.Es office. The posts of Sub Division No.2 vide details at Annexure-I to the Irrigation Division, Parvathipuram of Irrigation Circle, Bobbili to look after the operation & maintenance of Peddagedda Reservoir Project as well as ITDA works of Parvathipuram.

(3) To handover all the technical files to the Irrigation Division, Parvathipuram along with the staff proposed to be attached.
(4) To carry all the establishment / office files by the staff proposed to be attached to the Office of the Chief Engineer, North Coast, Visakhapatnam.

(5) To continue the lien and seniority of the circle scale establishment of Peddagedda Project Division as it is in Irrigation Circle,Visakhapatnam even after re-organization proposals.

3. This order issues with the concurrence of Finance (W&P) Department vide their U.O. No.3448/F7(A1)/2012, dated 24.11.2012.

4. The Engineer-in-Chief (AW), I&CAD Department, Hyderabad and the Chief Engineer, North Coast, Visakhapatnam are requested to take necessary action accordingly.

ANNEXURE to G.O.Ms.No.                I&CAD (M&MI (CA-1)

 

Department, dated 07-01-2013.

 

Statement   showing   the   Sanctioned   Strength   of   the   Peddagedda   Project
Division,  Salur  before  Re-  organization  and  Attachment  of  Posts  to  Irrigation
Division,   parvathipuram   and   O/o   Chief   Engineer,   North   Coast,   After   Re-
organization.      
         
Sl.No

Catego ry

Sanctioned

Posts now

Posts  attached to

   

strength of PP

attached to

the Irrigation

   

Division, Salur

the Office of

Division,

   

before re-

C.E., North

Parvathipuram of I.C.

   

organization

Coast after

Bobbili for O&M of

     

re-

Peddagedda Project

     

organization

& ITDA works after

       

re-organization

1

Executive Engineer

1

1

 

(DCE)

     

2

Deputy Executive

3

2

1

 

Engineer

     

3

Assistant Executive

13

9

4

 

Engineer/ Assistant

     
 

Engineer

     

4

Superintendent

1

1

5

Technical officer

1

1

6

Printing Technician

1*

7

Senior Assistant

6

5

1

8

Junior Assistant

5

4

1

9

Typist

1*

10

Office Subordinates

16 *

1

4

  Total

48

24

11