Dummugudem to Nagarjuna Sagar Project Tail Pond Link canal


Government of Andhra Pradesh in the year 2009 with GO 22 on 6 February have accorded Administrative Approval for Rs.8930.08 crores for Lift Irrigation Project from “Dummugudem to NSP Tail Pond” to divert 165 TMC of flood water from River Godavari .

Chief Engineer, Dummugudem – NSP Tail Pond Link Canal, Bhadrachalam has submitted the Revised Detailed Project Report pertaining to Dummugudem – NSP Tail Pond Link Canal Project for Rs.22,050.00 Crores.

Government have examined the proposal of the Chief Engineer, Dummugudem – NSP Tail Pond Link Canal, Bhadrachalam and was requested to refer the Revised Estimate
before the Expert Committee constituted for Pranahita Lift Irrigation Scheme and submit its minutes to Government.

Chief Engineer, Dummugudem – NSP Tail Pond Link Canal, Bhadrachalam, Khammam District has resubmitted the Revised Detailed Project Report of the Dummugudem – Nagarjuna Sagar Project Tail Pond Link Canal Project for Rs.19521.42 Crores duly incorporating the recommendations and deliberations of Expert Committee constituted for Pranahita Lift Irrigation Scheme. The cost of Revised DPR is increased mainly due to change of alignment of canal so as to avoid the area of Singareni Collories, Ayacut of N.S.P. and the Ayacut of Rajiv Sagar and revision of cost due to adoption of current S.S.R.

Government after careful examination of the proposal of Chief Engineer, Dummugudem – NSP Tail Pond Link Canal, Bhadrachalam and based on the recommendations of the Expert Committee, hereby accord
Administrative Approval for the Revised Detailed Project Report on Dummugudem – Nagarjuna Sagar Tail Pond Link Canal at an estimated cost of Rs.19,521.42 Crores subject to fulfilling the following :–

i) Service Tax will be reimbursed as per actuals on production of relevant documents if not included in the agreement and IBM.

ii) The relevant G.O./Memo. issued by the Government for making L.S. Provision at 1% in the estimate towards labour cess may be mentioned / included in the agreement.

iii) Ensure that Excise duty is not separately loaded in the data and also to avail exemptions of excise duty, wherever applicable.

The expenditure is chargeable to the Head of Account “DA.4701- Capital Out Lay on Major & Medium Irrigation; 01- Major Irrigation Commercial; MH 170 – Dummugudem – Nagarjunasagar Project Tail Pond; G.H. 11 – Normal State Plan; SH 27 – Canals and Distributaries; 530 – Major works; 531- Other Expenditure”.

This order issues with the concurrence of Finance (W&P) Department vide their U.O.No.213/F4(1)/2009-1 dated:28-1-2009.

VC&MD, TSIDC, Hyderabad has submitted estimates for according administrative approval for the work “ flood damage repairs of 19 Nos. of L.I. Schemes covered in Dummugudem, Cherla, Manuguru & Burgampadu Mandals excluding LI Schemes covered in residuary State of AP for an amount of Rs.77.30 Lakhs.

Government of Telangana after examination of the matter hereby accord administrative approval for an amount of Rs.75.25 Lakhs (Rupees Seventy Five Lakhs and twenty five thousand only) for the works of flood damage repairs to 19 nos. of LI schemes covered in Dummugudem, Cherla, Manuguru & Burgampadu Mandals of Khammam District, as detailed below, subject to meeting the expenditure from the available B.E.only.

SL Name of the scheme Mandal Estimate Estimate amount
No Cost (Rs.in after scrutiny
Lakhs) (Rs.in Lakhs)
1 Pusuguppa LIS Cherla 5.30 5.15
2 Vaddipeta-I LIS Cherla 4.80 4.65
3 Vaddipeta-II LIS Cherla 4.80 4.65
4 Subbampeta LIS Cherla 2.50 2.50
5 Govindapuram LIS Dummugudem 2.60 2.60
6 Bandarigudem LIS Dummugudem 2.80 2.80
7 Dharmapuram LIS Dummugudem 2.10 2.10
8 D. Kothagudem LIS Dummugudem 2.20 2.20
9 Lachigudem LIS Dummugudem 3.20 3.00
10 Gurralabailu LIS Dummugudem 4.10 4.00
11 Chinthaguppa –I LIS Dummugudem 3.10 3.10
12 Chinthaguppa –II LIS Dummugudem 3.80 3.70
13 Kothajinnelagudem Dummugudem 2.90 2.85
LIS
14 Sangham LIS Dummugudem 2.50 2.40
15 Paidigudem-II LIS Dummugudem 2.70 2.60
16 Lingapuram LIS Dummugudem 1.80 1.70
17 Pedanallaballi LIS Dummugudem 3.00 3.00
18 Ramanujavaram LIS Manuguru 18.50 17.80
19 Pinapakapattinagar Burgampadu 4.60 4.45
LIS
Total 77.30 75.25

The expenditure sanctioned in para (2) above, shall be debited to the Head of Account “4702-MH101-GH11-SH (18) – Restoration of Flood Damages LIS 530/531”.

The VC&MD, TSIDC, Hyderabad shall take necessary action accordingly, complete the work within stipulated period and furnish the Utilization Certificate to Government.

This order issues with the concurrence of Finance (EBS.IX) Department vide their U.O.No.9897 / 324 / A2/ EBS.IX/2015, dt.13-08-2015.

Flood damage repairs to 19 Nos. of Lift Irrigation Schemes in Dummugudem, Cherla, Manuguru & Burgampadu Mandals excluding LI Schemes covered in residuary State of AP – Administrative approval for an amount of Rs.75.25 Lakhs – Accorded – Orders – Issued.

IRRIGATION & CAD (MI.T) DEPARTMENT

Dummugudem to Nagarjuna Sagar Project Tail Pond Link canal

G.O.Rt.No.663 Dated: 05.09.2015.

1) G.O.Ms.No.125, I&CAD(Maj.Irr.III) Deptt., dt:16.05.2007 2) From the C.E., RSIS LIS’ & D – NSP TP.LC, Bhadrachalam, Khammam, Lr.No.CE.RSIS LIS’ & D-NSP TP LC/DCE.1/OTHLC/ AEE9/D-NSP TP LC/Gen/2008, dated: 23-12-2008. 3) Govt.Memo.No.34919/Maj.Irr.III/A2/2008-1, dt.24-12-2008. 4) From the Chief Engineer, RSIS LIS’ & D – NSP TP.LC, Bhadra- chalam, Khammam, Lr.No.CE.RSIS LIS’ & D-NSP TP LC/DCE.1/ OTHLC/AEE9/D-NSP TP LC/Gen/2008, dated 31-12-2008. 5) From the Engineer-in-Chief (IW), Hyderabad Lr.No.ENC/IW/P&M/ EE.1/DEE.8/300808, dated 31-12-2008.