1900 Crores for Greater Hyderabad Water Supply Distribution Network Project


Telangana State with GO MS 138 on 21 October 2015 issued Administrative Sanction of 1900 Crores for Hyderabad Metropolitan Water Supply and Sewerage Board – Water Supply Distribution Network Project for the peripheral Circles of Greater Hyderabad Municipal Corporation with an estimated amount.

The Managing Director, Hyderabad Metropolitan Water Supply and Sewerage Board, Hyderabad in the letter third read above has reported that, presently, the water supply in the peripheral circles of Greater Hyderabad Municipal Corporation area is once in 3 to 5 days due to inadequate storages and distribution network. In order to improve the water supply standards on par with the Core City, the project proposals were formulated by engaging the consultants and approached the Ministry of Urban Development, Government of India, for the funding under JNNURM, but it could not be materialized. Further, as per the instructions of the Government to explore the funding options for implementation of Water Supply Distribution Project for the peripheral circles of Greater Hyderabad Municipal Corporation, he has requested the HUDCO for providing loan assistance duly submitting the detailed project proposals amounting to Rs.1900.00 Crores. The project proposals consist of construction of the service reservoirs as per the hydraulic zones in each circle and providing the feeder mains as inlet mains and trunk mains as outlet and distribution network. The HUDCO has communicated the loan sanction letter (vide scheme No.20839) for an amount of Rs.1700.00 Crores and as such the balance amount of Rs.200 Crores of project has to be shared by the State Government/Board.

1900 Crores for Greater Hyderabad Water Supply Distribution Network Project

2. The Managing Director, Hyderabad Metropolitan Water Supply and Sewerage Board has further stated that, as the augmentation of water supply from Godavari Phase-I is nearing completion, for equitable distribution of supplies among all circles, it is very essential to implement the project proposals for creation of service reservoirs with inlet, outlet and distribution network. Further, as per the terms and conditions of HUDCO loan sanction letter, the Government counter guarantee is to be provided for Rs.1700.00 Crores and the commitment to the share amount of Rs.200.00 Crores is also to be provided. He has therefore requested the Government to accord administrative sanction

to the “Water Supply Distribution Network Project for the peripheral Circles of GHMC” at a cost of Rs.1900.00 Crores with HUDCO Loan Assistance of Rs.1700.00 Crores and the balance of amount of Rs.200-00 Crores with State Government budget provision to HMWSSB and to provide the State Government counter guarantee to the HUDCO loan assistance, for implementation of the Project.

3. Government after careful examination of the proposal of the MD, HMWS & SB, hereby accord administrative sanction for an amount of Rs.1900.00 Crores out of which an amount of Rs.1700.00 Crores from HUDCO Loan with Government counter guarantee and balance amount of Rs.200.00 Crores from State Funds, towards the cost of the “Water Supply Distribution Network Project for the peripheral Circles of GHMC” which covers the packages of service reservoirs, inlet and outlet mains and distribution network as per the details given in the annexure appended.

4. The Managing Director, Hyderabad Metro Water Supply and Sewerage Board, Hyderabad shall take necessary further action in the matter accordingly.

5. This order issues with the concurrence of Finance EBS.VIII) Department vide their U.O.No.12725/367/EBS.VIII/2015, dated:09.10.2015.

  1. From the Managing Director, Hyderabad Metro Water Supply & Sewerage Board, Hyderabad Letter No. HMWSSB/MD/WS-Network-Prop/Peripheral Circles/2015-16, Dated:19.06.2015.
  2. From the HUDCO, Hyderabad Lr.No.HUDCO/HRO/HMWSSB/20839/2015/2100, Dated:12.09.2015.
  3. From the Managing Director, Hyderabad Metro Water Supply & Sewerage Board, Hyderabad, Hyderabad, Lr.No.HMWSSB/MD/WS-Network-Prop/Peripheral Circles/2015-16/265, Dated:30.10.2015.
 

ANNEXURE

(Annexure to G.O.Ms.No.    , MA & UD Department, Dated:21.10.2015)

 

Water Supply Distribution Network Project for the peripheral Circles of GHMC
Sl No. Circle Amount Rupees in Crs.
1 Alwal 190-00
2 Qutbullapur 220-00
3 Kapra 215-00
4 Uppal 160-00
5 Kukatpally 290-00
6 Serilingampally 290-00
7 Rajendranagar 80-00
8 L.B. Nagar &  Gaddiannaram 325-00
9 Ramachandrapuram 60-00
10 Patancheru 70-00
Grand Total 1900-00